PROCON International served as prime contractor for design-build replacement of the wastewater treatment plant at the U.S. Embassy in Juba, South Sudan. The compound has no municipal sewer service, so on-site treatment is essential to the post’s habitability and environmental compliance. Treatment equipment was assembled through a multi-stage international supply chain spanning Israel, the United Arab Emirates and the United States, then delivered into a country with minimal local material availability and active armed conflict. The failing plant was demolished and replaced complete with civil works and utilities; approximately 80 percent self-performed.
At PROCON International you will not just build structures; you will build a portfolio of skills and experience that will preserve your perfect through career.